Call (727) 366-7607 · Text us · Mon–Sat 8:00 am – 5:00 pm · Sun closed · Mon–Sat 8–5 Florida Certified General Contractor · Lic. #CGC1541672
Services · Renovations & Permitted Work · General Contractor in St. Petersburg

Certified general contractor in St. Petersburg, FL

Patrick's Handyman and Remodeling Services is a Florida Certified General Contractor (Lic. #CGC1541672), based in Clearwater, that runs permitted remodels, additions, structural repairs and storm rebuilds for homeowners in St. Petersburg, FL, and manages each job through the city's final inspection. Licensed trade partners do the electrical, plumbing, A/C and roofing work on projects we manage. About seven in ten St. Petersburg housing units were built before 1980 (Census estimates; the median year built is 1969), and a remodel here can bring in the city's 49% flood rule or a historic review on top of the building permit. Tell us the address and the plan, and we'll walk you through what the city is likely to ask for.

Serving St. Petersburg.

What we do

What's included in our general contracting in St. Petersburg?

What a general contractor is licensed to do

State law defines a general contractor as one "whose services are unlimited as to the type of work which he or she may do" (s. 489.105(3)(a)). The same chapter makes a general, building or residential contractor responsible for building or altering structural components, and requires it to subcontract electrical, mechanical, plumbing, roofing, sheet metal, swimming pool and A/C work unless it holds that trade's license, with a few listed exceptions (s. 489.113(3)).

St. Petersburg permits, start to finish

St. Petersburg registers contractors before they pull permits: a state-certified contractor files a notarized Contractor Affidavit with the state license and insurance certificates naming the city. The city's portal says a notarized application, signed by the license holder or an authorized agent, must be received before a permit is issued, and a Subcontractor Job Card goes in for each applicable trade.

What your contract has to include

On a home remodel over $2,500, Florida requires the construction lien law notice in the contract, in bold capitals on the front page or on a separate page you sign (s. 713.015), plus a written explanation of your rights under the Florida Homeowners' Construction Recovery Fund (s. 489.1425). A contractor who takes more than 10% as the first payment has 30 days to apply for permits and 90 days after they issue to start, absent just cause or your written agreement to a longer period (s. 489.126(2)(a)).

Check the license yourself

A Florida contractor's license number has to appear in every offer of services, proposal, bid, contract and advertisement (s. 489.119(5)(b)). Ours is CGC1541672. Search it on DBPR's Verify a Licensee page before you sign anything.

Local rules

Permits and local rules.

Flood zones and the 49% rule

St. Petersburg's 49% rule covers every building in a flood hazard area and, the city says, "all repairs even if the damage is not caused by flooding," including work you do yourself or with donated materials. When repairs or improvements equal or exceed 49% of the structure's market value, the whole building has to be brought into compliance with current zoning, building and floodplain rules.

Historic districts and landmarks

A locally designated landmark, or a home in one of the city's local historic districts, needs a Certificate of Appropriateness before exterior alterations. The city's exempt-work list adds that properties in a local or national historic district "may not be exempt from permit requirements." For staff-approved certificates, the city's packet says permits must be obtained within 18 months of approval.

The under-$7,500 exemption

The city says its Permit Exemption form (s. 553.79(1)(g)) is for single-family work totaling less than $7,500 outside a flood hazard area. The city excludes structural components, which it says include window and door replacement, roofing, soffit and fascia, and siding, along with mechanical, electrical, plumbing and gas work, and state law bars dividing a project to get under the limit. Plan on permits for a remodel or an addition.

Notice of Commencement and inspections

The city's permit portal says a recorded Notice of Commencement is required when the job value exceeds $5,000, or $15,000 or more to repair or replace an existing heating or A/C system, and the city's residential checklist says the first inspection can't be scheduled until the city has received it. State law has the notice recorded before work starts on jobs over $2,500 (ss. 713.13(1)(a), 713.02(5)), with a copy to the permit office before the first inspection when the direct contract is over $5,000 (s. 713.135(1)(e)). We prepare the form with you.

From our customers

What do our customers say?

All reviews
★★★★★

Excellent work, prompt, clean, fair price and always stayed in contact via text to advise when he would be here. Highly recommend him.

Jim1937St. Pete · Google
★★★★★

Patrick’s work was very professional payed close attention to detail I would highly recommend him and his company. We will hire him again thank you for everything you have done for us very pleased

Jon R.Remodeling · Google
★★★★★

I'm not one to write a review, but I just had to. What a wonderful experience that I had with Patrick and his Son. They did a wonderful job with our remodel. Don't tell him this, but I think his pricing was super reasonable. That's a hard combo in this field I've found. So rush to call them for your next project.

Dan B.Remodel · Google
★★★★★

Patrick and his son Dillon did an excellent job for us on some remodeling projects going above and beyond expectations. They were very courteous, conscientious, detailed and reasonably priced. We highly recommend them.

WesRemodeling projects · Google
Questions

Common questions about general contracting in St. Petersburg

Do I need a general contractor to remodel a house in St. Petersburg?

Not for every job. St. Petersburg's List of Exempted Permits (revised 2014) says a building permit may not be required for "Cabinetry, counter tops, painting, papering, tiling, carpeting and other similar finish work," unless the work affects the structural integrity of a load-bearing wall or a fire-rated separation. Separate building, electrical, plumbing, mechanical or gas permits may still be required, and the list says projects in a designated flood zone still have to meet the city's substantial improvement rules and submit a cost breakdown for the exempt work. Storm repairs are different: the city says you or your contractor must apply for a permit to repair storm damage, including drywall, floors, doors, cabinetry and finishes. When you hire out a remodel that changes a structural part of the house, state law makes a general, building or residential contractor responsible for the construction or alteration of that structural component (s. 489.113(3)(a)); the owner-builder exemption below is the exception. The city decides what your project needs: (727) 893-7231. See our kitchen and bathroom remodeling pages, and our guide on when you need a handyman or a licensed contractor.

Do contractors have to register with the City of St. Petersburg?

Yes. The city's Contractor Affidavit says the form "will be used to obtain permits and receive notifications." From a state-certified contractor the city asks for the notarized affidavit, a copy of the state license, and proof of general liability insurance and of workers' compensation coverage (or a workers' compensation exemption) showing the City of St. Petersburg as certificate holder, plus a city business tax license only if the business is located inside city limits. The city's inspection instructions list "Contractor registration/renewal has not occurred" among the reasons an inspection can't be scheduled, so ask any contractor you're considering whether their St. Petersburg registration is current.

How do I check a St. Petersburg building permit or inspection?

Use the city's online Building Permits portal: choose "select permit," enter the application number, and open "plan tracking status" to see each trade's review. The portal says no account is needed to schedule or cancel an inspection, check plan tracking comments or inspection results, or view permit history. Inspections can also be requested on the city's 24-hour phone line, and the city says a two-hour inspection window may be available online by 8 a.m. on the morning of the inspection. We didn't find a standard plan review time for home remodels on the city's permitting pages (checked November 2026), so we don't promise one.

Does a remodel or addition trigger St. Petersburg's 49% rule?

It can, if the home is in a flood hazard area. The city counts any reconstruction, rehabilitation, addition or other improvement that costs 49% or more of the structure's market value as a substantial improvement, and the building then has to meet current flood rules, which may include elevating it. The city's Substantial Improvement review package is required when the estimated construction value is 25% or more of the structure's market value, and it asks for an itemized cost estimate and a contractor's affidavit. Market value comes from the tax assessment of the structure, without the land, or from an appraisal by a state-licensed appraiser completed within the last 12 months. We prepare the estimate and the affidavit for work we contract.

Do I need a Certificate of Appropriateness to remodel a historic home in St. Pete?

For exterior work on a locally designated landmark or a home in a local historic district, yes. The city's application packet says a Certificate of Appropriateness is required before any exterior alteration, including changes to walls, roof or windows, additions and demolition. Under the packet's approval matrix, additions of 250 square feet or more go to the Community Planning and Preservation Commission, and smaller ones can be approved by staff. National Register listing by itself doesn't restrict a private owner's alterations unless federal assistance is involved, the city says. Look up your address on the city's historic preservation map before you design anything.

Can I pull my own permit as an owner-builder in St. Petersburg?

Yes, within limits. Florida's owner-builder exemption covers your own one- or two-family home, for your own use and not offered for sale or lease, when you directly supervise all work not done by licensed contractors (s. 489.103(7)). St. Petersburg requires its Owner/Contractor Disclosure Statement with the owner's notarized signature, and its permit application says the owner must appear in person to sign it. That statement warns that unlicensed people often have an owner pull an owner-builder permit that "erroneously implies that the property owner is providing his or her own labor and materials." If a contractor asks you to pull the permit for work they are doing, treat it as a warning sign.

How do I verify a general contractor's license before I sign?

Ask for the license number and search it on the Florida DBPR's Verify a Licensee page at myfloridalicense.com. Florida law requires the number in every offer of services, proposal, bid, contract and advertisement (s. 489.119(5)(b)), and a contract entered into by an unlicensed contractor can't be enforced by that contractor (s. 489.128). Ours is CGC1541672.

Is my address inside St. Petersburg city limits?

Pinellas County says to search your address on the Property Appraiser's website or the county's My Neighborhood tool to see which municipality your property is in. Addresses inside the city permit through St. Petersburg's Construction Services and Permitting Division at the Municipal Services Center, One 4th St. N., (727) 893-7231; unincorporated addresses permit through Pinellas County. We check before we apply.

Sources

Page last updated

Have a project in mind?

Tell us about it and we'll send you a free, detailed estimate. No hidden fees.